The Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) requires that agencies make available to the public an Administrative Record of those documents that form the basis for selection of a response action at a site. The Administrative Record provides the basis for public participation and involvement, and provides a record for judicial review by documenting the government deliberative process.
The official hard copy Administrative Record for the Red Devil Mine Site RI/FS is available for public viewing during normal business hours at the Anchorage Field Office Public Room.
For more information about the Red Devil Mine Administrative Record, contact: Mike McCrum, Red Devil Mine Project Manager, 907-271-4426
An electronic copy of the CERCLA Administrative Record is indexed below. The documents are listed in order by date. Document date format is YYYY-MM-DD.
Each document is in Adobe Reader 7.0 or higher .pdf format. Some files have been compressed in self-extracting .zip files. Many files are large and, depending on your computer's capability or Internet connection, may take several minutes to open. For faster access, you may want to save the file to your computer and open from there.
Portions of the documents in this electronic Record may not be fully Section 508 compliant. Please contact Project Manager Mike McCrum if you need assistance with this Record.
Remedial Investigation | Supplemental Remedial Investigation | Feasibility Study | Supplemental Feasibility Study | Early Action | Final Proposed Plan | Monitoring | Other CERCLA Documents
2010-09-17 - Ltr to ADEC, Re 2010 LSE Coordination 205 Kb
2010-09-29 - Ltr from EPA, Re Cmnts on Draft Field Sampling Plan 219 Kb
2010-11-12 - 2010 LSE Field Sampling Plan 7.7 MB
2010-10-13 - FAX email to EPA, Re Proposed Soil Analytical Methods 651 Kb
2010-12-10 - RDM 2010 LSE Report - Part 1 13.3 MB
2010-12-10 - RDM 2010 LSE Report - Part 2 (Tables, Lab Data Pkg).zip 56.8 MB
2011-01-24 - Ltr from EPA, Re Cmnts of 2010 LSE Report 902 Kb
2011-01-19 - Ltr from ADEC, Re Cmnts on 2010 LSE Report 3.7 MB
2010-08-31 - Ltr to EPA, Re RI/FS Work Plan 486 Kb
2010-08-27 - Ltr to ADEC, Re RI/FS Work Plan 357 Kb
2010-08-24 - Ltr from EPA, Re RI/FS Work Plan 512 Kb
2010-08-20 - Ltr from ADEC, Re RI/FS Work Plan 435 Kb
2010-08-19 - Ltr from ADEC, Re RI/FS Work Plan 659 Kb
2010-07-07 - Ltr from ADEC, Re BLM Consumption Survey 739 Kb
2011-02-02 - USGS OFR 2011-1035, Geophysical Investigation of RDM 17.3 MB
2011-03-11 - Draft Final RI/FS Work Plan Part 1 6284 Kb
2011-03-11 - Draft Final RI/FS Work Plan Part 2 (Appendices) .zip 23.7 MB
2011-06 FINAL Red Devil Mine Work Plan
- 2011-06 FINAL RDM Work Plan June 2011 633 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP 359 Kb
- 2011-06 FINAL RDM Work Plan Appendix B RAWP 729 Kb
- 2011-06 FINAL RDM Work Plan Appendix C QAPP 528 Kb
- 2011-06 FINAL RDM Work Plan Appendix D SHASP 2733 Kb
- 2011-06 FINAL RDM Work Plan Appendix E Air Modeling 2048 Kb
- 2011-06 FINAL RDM Appendix F LSE Tables 652 Kb
- 2011-06 FINAL RDM Work Plan Charts 103 Kb
- 2011-06 FINAL RDM Work Plan Addendum 08-29-11 84 Kb
- 2011-06 FINAL RDM Work Plan Figure 1-1 9246 Kb
- 2011-06 FINAL RDM Work Plan Figure 1-2 10594 Kb
- 2011-06 FINAL RDM Work Plan Figure 1-3 6548 Kb
- 2011-06 FINAL RDM Work Plan Figure 2-1 9847 Kb
- 2011-06 FINAL RDM Work Plan Figure 2-2 9652 Kb
- 2011-06 FINAL RDM Work Plan Figure 2-3 11852 Kb
- 2011-06 FINAL RDM Work Plan Figure 2-4 11545 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-1 8560 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-2 8557 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-3 9359 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-4 6219 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-5 2834 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-6 8386 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-7 6722 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-8 7174 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-9 7174 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-10 7171 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-11 5761 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-12 5762 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-13 5758 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-14 6.50 MB
- 2011-06 FINAL RDM Work Plan Figure 3-15 9.3 MB
- 2011-06 FINAL RDM Work Plan Figure 3-16 9313 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-17 9313 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-18 9295 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-19 9296 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-20 9296 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-21 8397 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-22 8396 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-23 8397 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-24 8396 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-25 8396 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-26 8396 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-27 8353 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-28 8353 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-29 8353 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-30 5728 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-31 5728 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-32 5728 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-33 501 Kb
- 2011-06 FINAL RDM Work Plan Figure 3-34 743 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-1 10570 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-2 7034 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-3 10654 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-4 10944 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-5 7108 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-6 10645 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-7 10617 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-8 7063 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-9 10630 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-10 11558 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-11 8751 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-12 10756 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-13 6828 Kb
- 2011-06 FINAL RDM Work Plan Appendix A FSP Figure 2-13a 7856 Kb
2012-03 FINAL Draft Red Devil Mine RI Report
- 2012-03 Draft RDM RI Report Chapter 1 6063 Kb
- 2012-03 Draft RDM RI Report Chapter 2 8796 Kb
- 2012-03 Draft RDM RI Report Chapter 3 4821 Kb
- 2012-03 Draft RDM RI Report Chapter 4 12841 Kb
- 2012-03 Draft RDM RI Report Chapter 5 2106 Kb
- 2012-03 Draft RDM RI Report Chapter 6 (Risk Assessment) 2032 Kb
- 2012-03 Draft RDM RI Report Chapter 7 256 Kb
- 2012-03 Draft RDM RI Report Chapter 8 38 Kb
- 2012-03 Draft RDM RI Report Appendices 1220 Kb
- 2012-08-13 FINAL Responses to EPA Comments Draft RI Report 79 Kb
- 2012-08-13 FINAL Responses to ADEC Comments Draft RI Report 275 Kb
- 2012-08-13 FINAL Responses to ADEC (Brewer) Comments Draft RI Report Baseline HHERA 286 Kb
- 2012-08-13 FINAL Responses to ADEC (Wu) Comments Draft RI Report Baseline HHERA 210 Kb
- 2012-08-13 FINAL Responses to EPA & ADEC Comments Evaluating Consumption of Wild Foods Tech Memo HHRA 177 Kb
- 2012-08-13 FINAL Responses to EPA Comments Draft RI Report Baseline HHRA 298 Kb
- 2012-08-13 FINAL Responses to EPA Comments Draft RI Report Baseline ERA 159 Kb
2013-05-19 - BLM Responses to ADEC (Wu) Comments on Draft Final RI Report 231 Kb
2013-05-19 - BLM Responses to EPA Comments on Draft Final RI Report 384 Kb
2013-05-19 - BLM Responses to Palmieri Comments on Draft Final RI Report 54 Kb
2013-05-19 - BLM Responses to New EPA Comments on Draft Final RI Report 105 Kb
2013-08-20 - BLM Final Responses to Select EPA Comments on Draft Final RI Report 111 Kb
2014-11 FINAL Red Devil Mine RI Report
- Final Red Devial Remedial Investigation Report 42.93 MB
- Appendix A: 2012 Red Devil Baseline Monitoring Report 16.65 MB
- Appendix B: Soil Types 2.11 MB
- Appendix C: Data Validation Reports 115.965 MB
- Appendix D: ProUCL Input and Output Data 3.08 MB
- Appendix E: 2012 Additional Soil Characterization Data 9.34 MB
- Appendix F: Summary of Surface Soil, Subsurface Soil, and Groundwater Data 1.94 MB
- Appendix G: Proposed Approach to Evaluating Consumption of Wild Foods at the Red Devil Mine Site, Alaska, Version 2, and Response to Comments 2.07 MB
- Appendix H: Human Health ProUCL Inputs and Outputs 847 Kb
- Appendix I: Sculpin Metals Data 1876 Kb
- Appendix J: Human Health Risk Assessment Risk Hazard Tables 1229 Kb
- Appendix K: Lead Model 93 Kb
- Appendix L: Alaska National Heritage Correspondence 112 Kb
- Appendix M: Revised Screening Level Ecological Risk Assessment for the Red Devil Mine Site 1.12 MB
- Appendix N: Benthic Macroinvertebrate Data 144 Kb
- Appendix O: Baseline Ecological Risk Assessment ProUCL Outputs Summary 1.080 MB
- Appendix P: BLM Data Used to Calculate Benthic Biota Sediment Accumulation Factors 146 Kb
Powder House Work Plan
2010-09 - Final Work Plan RDM - Powder House Assessment Removal 11.4 MB
2010-09-29 - Ltr from EPA, Re Cmnts on Powder House Work Plan 218 Kb
2015-02-16 - Final Responses to ADEC (Wu) Comments on Draft RDM Work Plan 121 Kb
2015-06-29 - Final Responses to EPA Comments (C. Eckley) on RDM Draft Work Plan 126 Kb
2015-06-29 - Final Responses to Palmieri Comments on RI Supplemental Work Plan 113 Kb
2015-06-29 - Final Responses to ADHS (Hamade) Comments on Draft RDM Work Plan 88 Kb
2016-03 RDM Final Feasibility Study 20347 Kb
2015-09-17 BLM Responses to ADEC Solid Waste Division Comments on Draft Feasibility Study v3 99 Kb
2015-09-14 BLM Responses to ADEC CSRP Comments on Draft Feasibility Study v3 149 Kb
2015-11-02 BLM Responses to EPA Comments on Draft Feasibility Study v3 76 Kb
2015-11-02 Responses to EPA Comments #19 and #21 Feasibility Study 62 Kb
2014-09 RDM Draft Final Feasibility Study 8684 Kb
2015-03-19 Combined Comments on Draft Red Devil Mine Feasibility Study 198 Kb
2014-01-22 - Draft Solidification Treatability Study Tech Memo Dist to Agencies 16543 Kb
BLM Responses to EPA and ADEC Comments on Draft Solidification Treatability Study Tech Memo 35 Kb
2013-09-23 - E&E re: Treatability Study Red Devil Mine 958 Kb
BLM Final Responses to EPA Comments on Treatability Study Work Plan 111 Kb
BLM Final Responses to ADEC-Palmieri Comments on Draft Treatability Study Work Plan 36 Kb
2019-09-09 Red Devil Mine Final Technical Memorandum Hydro Analysis 2.65 MB
2019-08 Red Devil Mine Final FS Supplement Report 18.76 MB
2019-08 Final Red Devil Mine Groundwater and Surface Water Report 33 MB
2018-06-15 Draft Red Devil Mine Groundwater and Surface Water Report 125 MB
2018-01 Red Devil Mine Draft FS Supplement Report 61.27 MB
2014-02-19 Draft Engineering Evaluation/Cost Analysis for Proposed Early Action
2014-03-17 - Calista Corp comment letter re EE/CA 338 Kb
2014-03-21 - Georgetown TC comment letter re EE/CA 1 MB
2014-05-19 - BLM response to Calista Corporation 215 Kb
2014-05-19 - BLM response to Georgetown Traditional Council 670 Kb
Response to ADEC Wu Comments on Draft Engineering Evaluation/Cost Analysis 25 Kb
Response to A. Palmieri Comments on Draft Engineering Evaluation/Cost Analysis 50 Kb
Response to EPA Comments on Draft Engineering Evaluation/Cost Analysis 137 Kb
Response to EPHP Comments on Draft Engineering Evaluation/Cost Analysis 15 Kb
2014-04 Final Red Devil Mine Engineering Evaluation/Cost Analysis 14.7 MB
2014-04-30 Draft Red Devil Mine Action Memorandum 11.9 MB
Responses to ADF&G Comments on the Draft RMD Action Memorandum 95 Kb
Response to DHSS Comments on Draft RMD Action Memorandum 90 Kb
Response to DNR Comments on Draft RMD Action Memorandum 111 Kb
Response to A. Palmieri Comments on Draft RMD Action Memorandum 28 Kb
Revised Responses to EPA Comments on Draft RMD Action Memorandum 102 Kb
2014-06-25 Final Red Devil Mine Action Memorandum 24.6 MB
2020-02-01 Final Proposed Plan for Red Devil Mine
2019-07 Final Red Devil Mine Baseline Monitoring Report 91.5 MB
2019-05-16 State of Alaska Baseline Monitoring Work Plan Approval 233KB
2016-06 - FINAL Work Plan Groundwater and Surface Water Baseline Monitoring Red Devil Mine, Alaska
2010-03-30 - RDM RI/FS Project Management Plan 4.43 MB
2010-06-08 - RDM RI/FS Community Involvement Plan 718 Kb
2010-12-06 - RDM Community Involvement Plan Addendum 225 Kb